SECTION
I - INTRODUCTION .
1.1 Intent
1.2 Revisions
1.3 MLPC
1.4 Organization
SECTION
II - DESIGN REVIEW PROCESS & GUIDELINES .
2.1 Architect.
2.2 Preliminary Plans
2.3 Variances.
2.4 Final Plan Review, Architect's Stamp & Drawing Review
Fee
2.4.1 County Requirements.
2.4.2 Final Review.
2.4.3 Requirements of other Homeowners Associations.
2.4.4 Drawing Review Fee.
2.5 Final Plans.
2.5.1 Site Plan.
2.5.2 Floor Plan.
2.5.3 Elevations.
2.5.4 Colors.
2.5.5 Foundation Plan.
2.5.6 Details.
2.5.7 Landscape Plan.
2.5.8 Specifications.
2.5.9 Site Staking.
2.5.10 Construction Schedule.
2.5.11MLPC Design & Construction (D&C) Check List.
2.6 Independent Architectural Design Review.
2.7 Final Plan Approval and Security Deposit.
2.7.1 Deposit Amount.
2.7.2 Approval Notification.
2.7.3 Final Plans Drawing Signing by the MLPC ACC.
2.7.4 Post-approval Design Changes.
2.8 Security Deposit Refund Limits.
2.8.1 Construction Period.
2.8.2 Final Completion Time.
2.8.3 Staged Security Deposit Return.
2.9 Inspections.
2.10 Remodels and Additions.
2.10.1 Repair / Maintenance Projects.
2.10.2 Minor Remodels / Additions.
2.10.3 Moderate Remodels / Additions.
2.10.4 Substantial Remodels / Additions.
2.11 Outbuildings and Exterior Storage Enclosures.
SECTION
III - SITE GUIDELINES .
3.1 Setbacks and Building Envelopes.
3.2 Building Height.
3.2.1 County LUR Requirements.
3.2.2 MLPC Requirements.
3.3 Size Restrictions.
3.3.1 Minimum Living Area Size.
3.3.2 Integrated Secondary Residences.
3.3.3 Building Footprint.
3.4 Exterior Lighting.
3.4.1 Restrictions.
3.4.2 Down-Lighting.
3.4.3 Motion Detector Lights.
3.5 Privacy Walls and Barriers.
3.6 Fences.
3.6.1 Allowable Fence Location.
3.6.2 Animal Containment.
3.6.3 Allowable Fences.
3.7 Garages, Driveways and Parking.
3.7.1 Required Garage Size. .
3.7.2 Driveways.
3.7.3 Parking.
3.8 View Corridors.
3.9 Drainage.
3.9.1 Natural Drainage Paths.
3.9.2 Erosion Control.
3.10 Easements.
3.11 Propane Tanks. .
3.12 Signs. .
SECTION
IV - DESIGN GUIDELINES .
4.1 Exterior Building Walls and Finishes.
4.2 Exterior Foundation & Retaining Walls.
4.3 Chimneys.
4.4 Roof.
4.4.1 Roof Pitch.
4.4.2 Eave Overhangs.
4.4.3 Roof Colors. .
4.4.4 Roof Materials.
4.5 Solar Panels.
4.6 Windows and Doors.
4.7 Antennas.
4.8 Solid Fuel Burning Devices.
4.9 Exterior Fireplaces.
4.10 Landscaping.
SECTION
V - CONSTRUCTION REGULATIONS .
5.1 Construction Area.
5.2 Temporary Structures / Construction Trailers.
5.3 Storage of Construction Material and Equipment.
5.4 Daily Operation.
5.5 Noise.
5.6 Excavation Material. .
5.7 Debris and Refuse Removal.
5.8 Burning.
5.9 Vehicles and Parking.
5.10 Portable Toilet.
5.11 Signs.
5.12 Fire Extinguishers.
5.13 Flammable Items.
5.14 Dogs and Other Animals.
5.15 On-Site Camping.
5.16 Restoration and Repair.
MLPC
DESIGN & CONSTRUCTION CHECK LIST .
Owner Information (to be completed by the Owner)
Information from Owner needed by MLPC ACC .
Architect / Designer Information (to be completed by Owner) .
Contractor / Builder Information (to be completed by Owner) .
Design Summary (to be completed by Owner / Architect) ...
Building Contractor Rules (Completed by Owner & Contractor)
..
COUNTY METHOD FOR DETERMINING OF BUILDING HEIGHT .
SECTION
I - INTRODUCTION
The purpose of these Guidelines is to require and ensure that
new construction and improvements within this planned residential
community be made in compliance with the Declaration of Protective
Covenants for Meridian Lake Park Corporation (MLPC).
1.1 Intent.
The intent of the MLPC Design & Construction (D&C) Guidelines
is to ensure that new construction and improvements located within
Meridian Lake Park Filings 1, 2, 3 and 4 are compatible, blend
with the natural landscape and surrounding residences, optimize
views from each home site, minimize the visual impact of development
from other home sites, and preserve as far as possible a feeling
of open space.
1.2 Revisions.
The MLPC D&C Guidelines may be periodically amended. The
Guidelines posted on the MLPC website will be updated as soon
as modified. Below the title block will appear the following.
"NOTE: Board approved revisions and new guidelines subsequent
to the above date are shown in red with the date of Board approval.
The revisions and adoptions are not retroactive, but they become
effective on the first day of the following month." Following
each change will be a parenthetical comment such as "(adopted
/ revised by the MLPC Board, <month and year>)". Owners
should obtain the most recent revision of the Guidelines.
1.3 MLPC.
For purposes of these D&C Guidelines, "Meridian Lake
Park" or MLPC means Filings 1, 2, 3 & 4. These guidelines
are applicable to all Filings of Meridian Lake Park unless otherwise
indicated. Additional guidelines may be applicable for projects
in Filing 3 (Meridian Lake Meadows) and Filing 4 (Pristine Point).
1.4 Organization.
The "Board" means the Board of Managers of MLPC. The
MLPC Board is the Master Board for all Filings of Meridian Lake
Park. The MLPC Covenants defines the membership of the MLPC Architectural
Control Committee (ACC) as being all Board members. The Board
has delegated decision-recommending authority to a smaller group
of three to four Board members. This group is referred to as
the MLPC ACC. All final ACC decisions are made by the entire
MLPC Board. Only the MLPC Board President has the authority to
send project approval to the Gunnison County Planning Department,
after approval by the MLPC Board and after
Owners fees have been collected.
SECTION
II - DESIGN REVIEW PROCESS & GUIDELINES
2.1 Architect.
MLPC recommends that a licensed architect design your residence
at Meridian Lake Park. Be sure that your architect becomes familiar
with this document. Your architect should also be aware of and
follow:
· The Gunnison County Land Use Resolution (LUR) dated
January 1, 2001 and its subsequent amendments.
· The Uniform Building Code.
· The requirements of the Meridian Lake Park Covenants,
and if applicable, the additional Design, & Construction
Guidelines for Meridian Lake Park Corporation Revised December
16, 2004 2 requirements of the Meridian Lake Meadows (Filing
3) Covenants and Design Guidelines or Pristine Point (Filing
4) Covenants and Architectural Standards. In general, where there
is a conflict between requirements, the most restrictive requirement
prevails.
2.2 Preliminary Plans.
You should consider your site, architectural theme, special design
considerations, and the building program for your construction
project. If preliminary plans are prepared, they should include
a site plan, floor plans, elevations, exterior materials and
the building height calculation in accordance with the Gunnison
County LUR. If you wish the MLPC Board to review your preliminary
plans, send four (4) copies to the MLPC Manager. After review,
the MLPC Board will notify you in writing of what might present
a problem to the project.
2.3 Variances.
The Architectural Control Committee (ACC) will consider requests
for variances in the requirements of these Guidelines on a case-by-case
basis. Requests for variances must be submitted in writing to
the MLPC Manager.
2.4 Final Plan Review, Architect's Stamp & Drawing Review
Fee.
2.4.1 County Requirements.
Gunnison County requires that:
1. The building plans and specifications bear the seal of an
architect or engineer licensed by the State of Colorado, and
2. The Final Plans be approved by the local homeowners association.
2.4.2 Final Review.
All Final Plans must be reviewed by the MLPC ACC before submission
to the MLPC Board. Four (4) sets of Final Plan drawings bearing
the required architectural seals should be submitted to the MLPC
Manager at least 14 days before the next scheduled meeting of
the MLPC Board. Owners should identify any items of non-conformance
to these Design and Construction Guidelines, and are welcome
to attend a Board meeting to explain or clarify their Final Plans.
2.4.3 Requirements of other Homeowners Associations.
For projects in Filings 3 or 4, the Owner shall submit additional
copies of Final Plans to their Board as required by their Association.
2.4.4 Drawing Review Fee.
For all projects in Meridian Lake Park classified as New Construction
or Substantial Remodels / Additions (Section 2.10.4), the Owner
shall provide a $100 check payable to MLPC to cover the cost
of the drawing review by the MLPC Board.
2.5 Final Plans.
The Final Plans for New Construction or Substantial Remodel /
Addition (where applicable) shall include the following:
2.5.1 Site Plan.
The following must be shown on the Site Plan (minimum scale:
1" = 20'):
· Topographic survey (2' contours) prepared by a licensed
surveyor
· Property boundaries with setbacks and easements
· North direction and view direction of major mountains
· Footprint of building / decks / garage
· Location of driveway and designation of parking spaces
· Location of buried propane storage tank (if applicable)
· Location of retaining walls or structures
· Proposed grading and drainage paths
· Location of walkways and paths
· Location and type of landscape elements
· Location of construction area boundary (see Section
5.1)
· Designation of snow storage area(s)
· Outbuildings and storage enclosures (see Section 2.11)
if appropriate
2.5.2 Floor
Plan.
The Floor Plan (minimum scale: 1/8" = 1") is to include
all room dimensions, all window locations and sizes, location
of mechanical and electrical systems, and:
a) The square footage of the living area.
b) The square footage of the garage floor area.
c) The percentage of lot building envelope occupied by the residence
(see Section 3.3.3).
d) If an Integrated Secondary Residence (see Section 3.3.2) is
planned, those rooms must be so indicated and the total square
footage shown.
The living area is defined as the total floor area included within
the surrounding exterior walls less the garage, the mechanical
equipment room, unfinished attic, unfinished basement or crawl
space areas.
2.5.3 Elevations.
The following must be shown (minimum scale: 1/8" = 1'):
· Building height illustrated from the highest roof peak
to the lowest point where the foundation meets finished grade
· Building height illustrated by the County LUR Method
(see Section 3.2)
· All roof pitches defined
· All proposed exterior materials defined
· Location and size of all windows and doors
· Color of exterior finish (see Section 2.5.4)
· Type and color of roof (see Sections 2.5.4 & 4.4.3)
· Color of trim for windows & doors (see Section 2.5.4)
· Type of facing covering foundation (see Sections 2.5.4
& 4.2)
· Location of all exterior lighting fixtures with bulb
wattages (see Section 3.4)
2.5.4 Colors.
All colors must be earth-toned. Any color changes prior to and
during the construction must be submitted in writing along with
a color sample, before a color change can be approved. Color
samples must be provided as follows:
Part of Exterior Description Sample
Roof Metal roofing or asphalt shingles Required
" Wood shingles Not required
Siding Painted or pigmented stains Required
" Natural stains Required
Window trim & door trim Vinyl-clad or anodized Required
Door & window framing Can be more expressive colors Required
Stucco All types Required
Foundation facing Show type, pattern & mortar color for Required
rock facing. Indicate color for stucco.
2.5.5 Foundation Plan.
The foundation plan must be prepared and stamped by a Colorado
licensed engineer for all New Construction or for Substantial
Remodels / Additions. The Owner is responsible for providing
this drawing (minimum scale: 1/8" = 1') to the MLPC ACC
and the County for their review.
2.5.6 Details.
Provide any special design details to represent unique, external
visual expressions of the building, exposed connections, and
material interfaces.
2.5.7 Landscape Planning (for
New Construction).
See also Section 4.10 for information on plant selection
and for landscape plans for established residences. Include
the following landscape planning information for new construction
on the Site Plan.
- Drainage control, including drains and culverts. Drainage
must not be diverted onto another lot.
- Planting plan with proposed plant materials and tree types
(as known at the time of submission). Indicate plans to
reseed disturbed earth areas. Avoid continuous lines of trees
that might impede a neighbor's view.
- Any earth or rock berms.
- Any retaining walls. If concrete retaining walls are
proposed, indicate the proposed facing material. See also Section
4.2.
- Location of patios, walkways, driveways, trellis structures
and freestanding structures.
Note that landscaping inside easements or setbacks, while
not prohibited by MLPC, is undertaken at the Owner's risk. If
utility companies or the County require access on their easements,
landscaping could be removed or damaged without compensation
to the owner.
2.5.8 Snow Storage.
Show the location of all proposed snow storage areas on the Site
Plan. Snow removal should be retained on your own lot.
2.5.9 Specifications.
Provide written specifications for items that are required in
this guideline, such as exterior "down-lighting" (Section
3.4) and fireplaces (Sections 4.8 & 4.9). Specifications
shall include types, materials and colors.
2.5.10 Site Staking.
Site staking of the building corners, driveways and other improvements
is recommended. This is the responsibility of the Owner and contractor.
Surveyor pins at lot corners may be permanently staked with 4-foot-high
wood or earth-toned metal stakes.
2.5.11 Construction Schedule.
Projected starting and completion dates of the residence and
completion of landscaping are to be furnished on the "MLPC
Design & Construction Check List." (See also Section
2.8.1.)
2.5.12 MLPC Design & Construction (D&C) Check List.
The MLPC D&C Check List is required for all projects classified
as New Construction or for Substantial Remodels / Additions (Section
2.10). The D&C Check List provides information on the Owner,
design firm, the construction firm and the specific rules the
contractor must follow. (See Attachment)
2.6 Independent Architectural Design Review.
The MLPC Board may choose to submit a copy of the construction
plans to an independent local architect for review This will
be done at the expense of the Owner. MLPC will bill the Owner
for this review.
2.7 Final Plan Approval and Security Deposit.
2.7.1 Deposit Amount.
In addition to the drawing review fee (see Section 2.4.4), a
refundable Security Deposit check payable to MLPC is required
before MLPC approval will be given to the County. The Security
Deposit is intended to ensure that the project is built in a
timely manner, built according to the approved plans, and that
post-construction clean-up and landscaping restores the site
to a finished condition.
The size of the Security Deposit for New Construction is governed
by house living area, as follows:
· For houses under 3,000 sq. ft., the required deposit
is $1,500.
· For houses between 3,000 sq. ft. and 4,000 sq ft, the
required deposit is $2,000.
· For houses over 4,000 sq. ft., a $2,500 deposit is required.
The size of the Security Deposit for Remodels or Additions is
governed by the scope of the project, as follows:
· Repair / Maintenance projects (see Section 2.10.1),
no deposit required.
· Minor Remodels / Additions (see Section 2.10.2), deposit
not normally required.
· Moderate Remodels / Additions (see Section 2.10.3),
the required deposit is $500.
· Substantial Remodels / Additions (see Section 2.10.4),
the required deposit is $1,000.
2.7.2 Approval Notification.
The President of MLPC will notify the Owner of the approval to
construct within one month of the subsequent MLPC Board meeting,
unless (1) problems are discovered in an independent architectural
review, or (2) all of the submission requirements have not been
met.
2.7.3 Final Plans Drawing Signing by the MLPC ACC
Three (3) copies of the approved Final Plans shall be signed
and dated by an ACC member. Two (2) copies will be given to the
Owner. The MLPC Manager will keep one copy for reference.
2.7.4 Post-approval Design Changes
Any significant change to the approved Final Plans for New Construction,
or for Substantial or Moderate Remodels / Additions must be presented
to the MLPC ACC for approval or MLPC may require the Owner to
return the residence to the approved Final Design at his or her
own cost. Significant changes include but are not limited to
the following:
· House site position.
· Roof color or type.
· Siding type or color.
· Foundation covering.
· Solid fuel burning devices.
· Driveway location or configuration.
· Deck or patio
2.8 Security Deposit Refund Limits.
2.8.1 Construction Period.
Primary construction must be completed within twenty (20) months
from the issuance of a County building permit. Primary construction
completion is defined as the Owner being issued a County temporary
or permanent Certificate of Occupancy (CO) or otherwise assuming
residency. Failure to complete primary construction within 20
months, unless extended for good and sufficient cause by the
MLPC Board, is sufficient cause for forfeiture of the Security
Deposit.
2.8.2 Final Completion Time.
After the residence has been determined by MLPC to be physically
occupied, or after the Owner has been issued a temporary or permanent
CO, the Security Deposit will be forfeited to the Association
if the project has not been completed (per the definition in
Section 2.8.3) within one year, unless a time extension is approved
by the MLPC Board. The MLPC Manager will notify the Owner in
writing three months after physical occupation that the one-
year completion time clock has started. After ten (10) months
have passed, the MLPC Manager will again remind the Owner in
writing of the need to complete their project or apply for an
extension from the Board.
2.8.3 Staged Security Deposit Refund.
Half (50%) of the Security Deposit will be refunded after the
MLPC Board has determined that:
1. The owner has obtained a permanent CO.
2. All exterior work has been completed in accordance with the
approved plans, including driveways and retaining walls.
3. All construction-related equipment, materials and debris have
been removed from the site.
4. Damage to adjacent lots or open space has been repaired, and
5. The lot surface has been smoothed to the original contours
or to contours specified in the approved site plan.
The remainder of the Security Deposit will be refunded after
the MLPC Board has determined that the planting of trees, shrubs
and re-vegetation seeding have been
completed in accordance with the approved landscape plan.
2.9 Inspections.
The Owner and/or contractor shall request inspections and obtain
approvals for all phases of construction required by the County.
The MLPC Board reserves the right to inspect any project at any
time to ensure it conforms to the approved Final Plans. If problems
are found, the cost of the inspection and the corrections will
be the responsibility of the Owner. The Owner must request a
CO from the County. The Owner is required to notify the MLPC
Board when a temporary or permanent CO is received, or residency
is begun, to provide for regular trash collection and to change
the dues structure. Failure to notify the MLPC Managers concerning
the CO will delay the return of the Security Deposit.
2.10 Remodels and Additions.
Remodels or additions that alter the exterior appearance of the
building (painting a different color, room or deck additions
or modifications, re-roofing with a different roofing material
or color etc.) are subject to MLPC approval. Plans must be presented
prior to beginning the remodel or addition. If the residence
becomes uninhabitable, MLPC dues will be reduced to the amount
charged for vacant lots. Owners, who fail to ask for and gain
MLPC Board approval before commencing the project, may be required
to have the work redone or undone at the Owners expense. The
following categories apply:
2.10.1Repair / Maintenance Projects.
This includes simple projects such as driveway paving, on-going
landscaping, repainting or re-roofing without color or material
change. These are not considered
remodel / addition projects and there is no requirement to seek
approval of the MLPC Board.
2.10.2 Minor Remodels
/Additions.
This includes items such as modifications to an existing deck,
flagpoles, structural additions of less than 200 sq. ft., roof
color or material changes, outbuildings etc. If a foundation
for a living area is necessary, a foundation plan (Section 2.5.5)
is required. MLPC Board approval is required, but a Security
Deposit or MLPC D&C Check List will not normally be required.
2.10.3 Moderate Remodels / Additions.
This category includes items such as house siding replacement,
addition of a new deck, balcony or exterior stairs, additional
fireplace(s), changes in windows, any structural additions over
200 sq. ft. but less than 1000 sq. ft. etc. Revised Site Plans
(Section 2.5.1), Floor Plans (Section 2.5.2), and Elevations
(Section 2.5.3) are required. If a foundation for a living area
is necessary, a foundation plan (Section 2.5.5) is required and
the exterior lighting for the residence must be modified to meet
the standards of Section 3.4. MLPC Board approval is necessary,
and a $500 Security Deposit will be required.
2.10.4 Substantial Remodels / Additions.
This applies to any structural additions over 1000 sq. ft. and
to any conversion of a portion of an existing residence to include
an Integrated Secondary Residence. A drawing review fee (Section
2.4.4) is required. Any resulting Integrated Secondary Residence
must meet the requirements of Sections 3.3.2 and 3.7. The exterior
lighting for the residence must be modified to meet the standards
of Section 3.4. MLPC Board approval is necessary, and a $1000
Security Deposit will be required.
2.11 Outbuildings and Exterior Storage Enclosures.
The MLPC Board must approve all outbuildings (including greenhouses)
and exterior enclosures to be used for storage.
· Exterior siding must be either wood or should match
the existing siding on the house.
· The roof must match the material and color of the house
roof.
· Location must be either detailed on a site plan or the
corners must be staked.
· Location must not interfere with view corridors of neighbors.
SECTION
III - SITE GUIDELINES
These site and landscape guidelines are intended to help Owners
and architects design residential structures that are suitable
for MLPC.
3.1 Setbacks and Building Envelopes.
Required MLPC setbacks are 25 feet from the front and back property
lines and 15 feet from the side property lines. No structures
or parking are permitted in the setbacks. For lots which front
two streets, the MLPC ACC may determine which lot sides are considered
to be front and the back sides. Filing 3 has approved designated
building envelopes that are generally more restrictive than MLPC
guidelines.
3.2 Building Height.
3.2.1 County LUR Requirements.
Building height in Meridian Lake Park will generally conform
to the Gunnison County Land Use Resolution (LUR) Building Height
Definition as amended in the LUR Appendix A. LUR Section 5-403
F on Height Restrictions states:
1) All residential structures with pitched roofs shall not exceed
30 feet in height, and
2) Height shall be measured as the vertical distance above a
reference datum measured to the average height of the highest
gable of a pitched roof. The
reference datum shall be either:
a) The elevation of the highest adjoining ground surface within
a 5-foot horizontal distance of the exterior wall of the building
when such ground surface is not more than 10 feet above the lowest
grade, or
b) An elevation 10 feet higher than the lowest grade when the
ground surface described in a) is more than 10 feet above the
lowest grade.
The height determination diagram used by the County is attached.
Owners should check with Gunnison County to ensure height restriction
requirements have not
changed.
3.2.2 MLPC Requirements.
If the building height as measured from the highest roof peak
to the lowest point where the foundation meets finished grade
exceeds 35 feet, but meets the County
height restrictions, the owner must seek a variance from the
MLPC Board. Lots on steep slopes will be given special consideration.
3.3 Size Restrictions.
3.3.1 Minimum Living Area Size.
The minimum square footage for the living area is 1,750 sq. ft.
The living area is the area included within the surrounding exterior
walls minus the space identified in Section 2.5.2.
3.3.2 Integrated Secondary Residences.
If an Integrated Secondary Residence is included, the County
LUR limits the living area to between 400 and 850 sq. ft.
3.3.3 Building Footprint.
The coverage, or total building footprint, of all the structures
on the lot is limited to 30% of the building envelope (the area
enclosed within the setbacks) unless a variance is approved.
A building footprint is defined as the area the structure covers
when seen from directly above, less the roof overhangs (eaves).
This provision does not apply in Filing 3, where building envelopes
serve to restrict the footprint.
3.4 Exterior Lighting.
3.4.1 Restrictions
Exterior lighting is restricted in MLPC to minimize surface light
pollution. Exterior lighting shall be used only to illuminate
areas of pedestrian activity or vehicular traffic. The total
wattage of all exterior light bulbs may not exceed 1000 watts.
Exterior lighting must not be installed so that it produces excessive
glare to neighbors, pedestrians or vehicular traffic.
3.4.2 Down-Lighting
"Down-Lighting" must be used for all out-of-doors lights.
Bare light bulbs or lamp lenses of exterior lights must not be
visible to neighbors. Houses located at elevations higher than
other houses may be required to have fixtures with a narrower
downward light cone.
3.4.3 Motion Detector Lights
One motion detector exterior lighting fixture per residence is
permitted for safety and security considerations. This fixture
may have no more than two 50 watt, narrow beam spotlight bulbs
with shielded "down lighting" fixtures. The light fixture
must be focused downward to prevent the bulbs from being seen
from beyond the property line. The timer on the motion detector
must be set to no more than 5 minutes lighting duration.
3.5 Privacy Walls and Barriers.
Walls or other barriers including berms and hedges are not allowed
for the purpose of enclosing or demarcating Site or Lot boundaries;
however, walls and barriers may be used for privacy and screening
purposes within the building site. These must be reviewed by
the MLPC ACC for design, appropriateness, size, and materials
in relation to the proposed residence and neighboring sites.
3.6 Fences. (Revised March 16, 2006)
3.6.1 Allowable Fence Location.
Fences are generally
discouraged in MLPC, to protect the open feeling and rural character
of our development. As described below, however, variances may
be approved by the Board on a case by case basis. Fences shall not be permitted for the purpose
of enclosing or demarcating Site or Lot boundaries. An
exception to this prohibition is the MLPC-maintained perimeter
fence which encloses Meridian Lake Park and protects the development
from cattle intrusion. Fences, to the extent permitted, must
be designed to create a harmonious appearance with the residential
structures and surrounding landscape. Fences must be maintained
in a safe and attractive condition. Any fence considered to be
in a state of disrepair must be either repaired or removed within
14 days of written notice.
3.6.2
Animal Containment.
Within MLPC boundaries,
fences may be used for animal containment and protection. The
use of underground electric fences is the preferred method for
domestic animal containment. When an above ground fence is
proposed, it must be designed to the following standards:
Height: 48 inches or less measured
from the top of the top rail or wire (i.e. the highest horizontal
element) to the average grade between two adjacent posts. Fence
posts may be higher than 48" but must not exceed 54 inches
above grade (as measured from the base of the post).
Materials:
Posts are recommended to be constructed
from either:
a) Logs of a pre-approved average diameter.
b) Square dimensional lumber (stained to a pre-approved
shade) 4 inch minimum to 8 inch maximum size.
c) All other proposed materials must be approved by the
Board in advance. No "T" section metal agricultural
fence posts will be permitted.
Rails are recommended to be constructed
from either:
a) Logs of a pre-approved average diameter
b) Split logs
c) Square dimensional lumber (stained to match posts)
d) Tubular or square metal rails
e) All other proposed materials must be approved by the
Board in advance.
Retaining material must be either
4 inch or 6 inch rectangular welded, rusted, wire mesh
(WWM). All other proposed materials must be approved by the Board
in advance.
Chicken wire or chain link materials are not allowed.
3.6.3 Fence Approvals.
All proposed fences (landscaping included.)
must be approved by the Board of Managers
3.7 Garages, Driveways and Parking.
3.7.1 Required Garage Size.
A minimum 500 sq. ft. two-car garage is required. If the residence
contains an Integrated Secondary Residence, an additional 200
sq. ft. one-car garage dedicated for
the Secondary Residence is required. If an Owner has, or plans
to have, recreational vehicles including motor bikes, snow mobiles,
or all terrain vehicles, additional garage space will be required.
The D&C checklist asks if storage space has been included
for all recreational vehicles and trailers.
3.7.2 Driveways.
Driveways within a lot must be designed according to County regulations
and a Gunnison County driveway permit must be obtained if the
driveway connects to a
County road. Driveways may access the streets through setbacks.
3.7.3 Parking.
The area directly in front of a two-car garage is normally designated
to be two parking spaces. One additional designated parking space
is allowed within the building envelope (See Section 3.1) for
a maximum of three designated parking places. No portion of the
driveway in a setback may be designated for parking.
3.8 View Corridors.
View corridors of surrounding houses and lots must be considered
when designing a house. As the build out of MLPC continues, maintenance
of existing view corridors will become difficult, perhaps impossible.
An effort during the design phase must be made to consider the
impact of new construction on the view corridors of surrounding
sites. The new structure must blend with the surrounding landscape.
3.9 Drainage.
3.9.1 Natural Drainage Paths.
No Owner or contractor may construct improvements or install
landscaping which alters the drainage pattern or diverts run-off
from its natural flow path. Run-off from roofs and pavement areas
shall be directed to natural or improved drainage channels or
be dispersed into shallow sloping vegetated areas (swales).
3.9.2 Erosion Control.
An erosion control and re-vegetation design is required in the
Final Plans. This shall include the following:
· Measures to control ground water, roof and pavement
runoff water, and surface water runoff so that neighboring lots,
open space and nearby houses are not
affected.
· The Owner shall describe on the Site Plan the measures
to be taken to revegetate and stabilize all disturbed areas.
3.10 Easements.
Easements may be located on Sites
for installation and maintenance of utilities, drainage facilities
and / or irrigation ditches. Within these easements no
grading, structures, walls, or other impediments
are permitted which may damage or interfere with the utilities,
drainage or irrigation. All trunk utility lines, pipes, and
connections to individual structures must be underground.
3.11 Propane Tanks.
Propane tanks (if installed) must be buried.
3.12 Signs.
Refer to the MLPC Covenants for details. See also Section 5.11.
SECTION
IV - DESIGN GUIDELINES
These guidelines apply to the design and construction of residences
and building improvements.
The following design standards apply:
4.1 Exterior Building Walls and Finishes.
The following materials may be used for exterior walls of the
building:
· Wood with either a natural or transparent stain, painted,
or pigmented color stain finish. Paints and colored-stains must
be earth-toned.
· Stucco with an earth-toned coloration.
· Rock with earth-toned coloration mortar.
All other types of materials such as corrugated steel, must be
reviewed by the MLPC ACC and specific approval must be issued
in writing by the MLPC Board. The use of vinyl or aluminum siding
is expressly prohibited.
4.2 Exterior Foundation & Retaining Walls.
Foundation and retaining walls shall be faced with stucco, wood
or rock if exposed for more than one foot in the vertical direction.
Proposed use of other facing materials must be reviewed by the
MLPC ACC, and approval must be issued in writing by the MLPC
Board.
4.3 Chimneys.
All chimney pipes exposed over two (2) feet above the highest
penetration through the roof must be enclosed with natural materials
compatible with the structure.
4.4 Roofs.
4.4.1 Roof Pitch.
Roof pitches must not be less than 4/12.
4.4.2 Eave Overhangs.
Large roof or eave overhangs are encouraged. A twelve-inch minimum
eave overhang is required.
4.4.3Roof
Colors All roof colors shall be earth-toned
and non-reflective. Multi-colored roofs are not allowed.
Since some colors fade over time, the Owner should carefully
choose the roof color. Some metal roof colors and treatments
have been found to be unsatisfactory and are prohibited.
These include:
- Any glossy finish including copper.
- All bright primary (blue, red and yellow) colored
roofs.
Rusted corrugated roofs
(and / or siding, see Section 4.1) will be allowed only when
they are properly treated for a uniform rusted appearance and
are consistent with the overall architectural design of the house.
This judgment will be made by the MLPC ACC.
4.4.4 Roof Materials.
Approved roof materials are enamel-colored metal roofs, fire-retardant
simulated shake shingles, fire-retardant cedar shake shingles,
and asphalt shingles.
4.5 Solar Panels.
Solar panels may be located on the roof if at the same angle
and flat against roof. Solar panels may also be installed integral
with exterior walls. Other proposed locations for solar panels
require a variance.
4.6 Windows and Doors.
Window casings and exterior doors shall be wood or dark, non-reflective
metal. Approved finishes are neutral stained, painted, or clad.
Colors must be approved by the MLPC ACC. Reflective or mirrored
glass is not allowed. Windows shall not be used in combination
to produce large, uninterrupted glass areas. Windows shall be,
as a minimum, double-glazed.
4.7 Antennas.
All antennas must generally be attached to a residence. Free-standing
antenna towers are not permitted without a variance from the
MLPC Board. Television satellite or other dish antennas may not
be larger than 18 inches in diameter. Amateur or "Ham"
radio antennas are permitted, subject to a case-by-case review
by the MLPC ACC.
4.8 Solid Fuel Burning Devices.
Any New Construction or Substantial Remodel / Addition of an
existing residence shall only have Approved Solid Fuel Burning
Devices, limited to a maximum of two (2). An Approved Solid Fuel
Burning Device is defined as a device designed or intended to
burn solid fuel (excluding coal) and certified to meet the Environmental
Protection Act Phase II particulate emissions rate standard set
by the U.S. Environmental Protection Agency (EPA), or certified
to meet those standards by a testing laboratory accredited by
the EPA, or approved by the Colorado Air Quality Control Commission.
4.9 Exterior Fireplaces.
Use of exterior wood-burning fireplaces is generally considered
a hazardous activity. "Open pit" fireplaces are not
allowed. However on a case-by-case basis, MLPC will consider
granting a variance for an exterior fireplace under the following
circumstances:
· The lot is remote from surrounding vegetation and neighbor
properties, as determined by the MLPC ACC.
· The exterior fireplace is connected to the primary residence
and vented through a chimney.
· The open face of the exterior fireplace has a solid
door (glass or metal) that can be closed when the fire is being
extinguished or left unattended.
· The open face of the exterior fireplace is further protected
from the emission of sparks or burning debris by a fireproof
hearth to a radius of five (5) feet. A fireproof hearth may be
stone, tile or some other fireproof material.
4.10 Landscaping and Landscape
Plans for Existing Residences.
Owners are encouraged to use plants that preserve both
on and off-site views, provide seasonal shade, and screen undesirable
views. New planting should use plants indigenous to a Rocky
Mountain alpine or sub-alpine environment. Groomed yards and
ornamental plants, if planted, should in general be limited to
the areas adjacent to buildings. Because of the relatively short
growing season at Meridian Lake, the planting of larger deciduous
trees and evergreens is recommended.
Owners should use caution
when landscaping in easements due to the risk of damage from
the utilities' or the County's need to perform maintenance in
the easement.
Landscape plans for existing
residences need not be submitted for approval providing they
do not violate one of the following provisions:
- No free standing
structures or retaining walls may be located in easements or
setback areas.
- No large rocks that might damage snow plows may be
located in roadway easements.
- Drainage must not be diverted onto another lot.
- No earth or rock berms may be located in easements
or setback areas.
- Snow removal should be retained on your own lot.
If any one of these provisions
is proposed, a landscape plan must be submitted to the Board
on a surveyed site plan that shows the location of all existing
easements, setbacks and structures on the lot. Depending on
the scope of the landscape plan a security / clean-up deposit
may or may not be required.